Skip to main content

EAM - Enterprise Asset Management

EAM is a solution for integrated management of the entire manufacturing equipment lifecycle. It systematically establishes and executes maintenance strategies ranging from equipment registration through Preventive Maintenance (PM), Breakdown Maintenance (BM), and Predictive Maintenance (PdM), while maximizing equipment efficiency through OEE analysis and Six Big Losses management. It includes S-Tier extended features such as mold management, statutory inspections, and calibration management, and integrates with the MRO solution for unified maintenance materials management.

Solution Scale​

CategoryCountDescription
Tables8078 domain + 2 system
Relationships12788 domain + 39 SYSTEM_REF
Workflows6PM, BM, CBM/PdM, Warranty Claim, Statutory Inspection, PdM Diagnosis
Management Screens45+List/Dashboard views
POP Screens4Optimized for shop-floor touch terminals
Dashboard Widgets15KPI cards, line charts, pie charts, bar charts, gauges, stat cards
Document Templates4Work order, history card, failure analysis report, inspection checklist

Core Domains​

Document Structure​

DocumentContentsTable Count
Equipment ManagementEquipment master, hierarchy, specifications, spare parts, documents, lifecycle events, acceptance inspection7
Maintenance Planning/ExecutionPM master, PM schedule, BM, work orders, TPM, daily inspection, checklist14
Failure Analysis / ReliabilityFailure records, breakdown reports, breakdown analysis, FMEA, reliability metrics5
Sensor / Predictive Maintenance / OEESensor data, sensor aggregates, PdM alerts, PdM diagnosis, AI models, OEE, Six Big Losses, performance KPI11
S-Tier ExtensionsWarranty management, RCM, LOTO, maintenance SLA, WO costing, mold, budget/outsourcing, calibration, lubrication, tools, safety, statutory inspection~20
POP TerminalFailure reporting, maintenance work logging, PM checklist, equipment status monitor4 screens
Menu GroupKey Screens
Equipment ManagementEquipment Master, Equipment Hierarchy, Equipment Specifications, Spare Parts, Equipment Documents, Lifecycle Events, Acceptance Inspection
Maintenance PlanningMaintenance Plan, PM Master, PM Master Items, PM Schedule, Checklist Items, Daily Inspection Results, TPM Activities
Maintenance ExecutionWork Order, PM Work Order, PM Work Result, PM Parts Used, BM Work Order, BM Work Result, BM Parts Used
Failure AnalysisFailure Records, Breakdown Reports, Breakdown Analysis, FMEA Analysis, Reliability Metrics
Sensor / Predictive MaintenanceSensor Data, Sensor Aggregates, PdM Alerts, PdM Diagnosis Reports, AI Models, Model Performance, CBM Config, OEE Records, Downtime Events, Six Big Losses, Performance KPI
Budget / OutsourcingMaintenance Budget, Outsource Contracts, Outsource Maintenance Items
Mold ManagementMold Master, Shot Count Log, Mold Maintenance History, Mold Inspection, Mold Checkout Log
Safety / UtilitiesCalibration Management, Lubrication Management, Tool Management, Safety Work Permits, Utility Meter Readings, Statutory Inspections, Statutory Inspection Deficiencies

Workflow List​

WorkflowNode CountTriggerCore Process
Preventive Maintenance (PM)~16Timer (scheduled)Auto WO creation > Parts check > [Available: Execute > Trial run > Approval > Record] / [Shortage: Notify > Procurement]
Breakdown Maintenance (BM)~20Failure reportReceive > [Emergency: Notify > Assign > Repair > RCA > Prevention approval > Report] / [Normal: Assign > Repair > RCA > Record]
CBM / Predictive Maintenance~15Sensor triggerAnalyze > [Abnormal: Notify > Diagnose > WO > Action > Approval > Record] / [Normal: Monitor]
Warranty Claim~14Manual entryRegister > Warranty scope check > [Covered: Evidence > Vendor > Approve/Reject/Negotiate] / [Not covered: Close]
Statutory Inspection Defect > WO~12Defect foundSeverity assessment > [Critical: Emergency WO > LOTO > Execute > Verify] / [Minor: Planned WO > Schedule]
PdM Diagnosis > WO~12PdM diagnosis completeAction required assessment > [Immediate BM / Planned PM / Monitor / Log]

Dashboard Widgets​

WidgetTypeData SourceDescription
Overall OEEKPI Cardeam_oee_recordsTarget 85%, Availability x Performance x Quality
PM Compliance RateKPI Cardpm_work_ordersTarget 95%, Execution rate vs. plan
MTBFKPI Cardreliability_recordsTarget 720h, Mean Time Between Failures
MTTRKPI Cardreliability_recordsTarget 4h, Mean Time To Repair
OEE Trend (30 days)Line Charteam_oee_records30-day OEE trend
Downtime Trend (30 days)Line Chartdowntime_events30-day downtime by equipment
Failure Type DistributionPie Chartfailure_recordsBreakdown by type (mechanical, electrical, instrumentation, etc.)
Work Type DistributionPie Charteam_work_ordersBreakdown by type (PM, BM, PdM, etc.)
Failures by EquipmentBar Chartfailure_recordsFailure count per equipment
Maintenance Budget vs. ActualBar Chartmaintenance_budgetsBudget vs. actual spending comparison
Equipment Availability RateGauge Charteam_oee_recordsred: 60, yellow: 80, green: 92
Equipment Performance RateGauge Charteam_oee_recordsred: 50, yellow: 75, green: 90
Mold Life StatusMold KPImoldsRemaining life ratio (target 70%)
In-Progress Work OrdersStat Cardeam_work_ordersCount of currently active WOs
Unresolved FailuresStat Cardfailure_recordsCount of incomplete failure records
Sensor Anomalies (24h)Stat Cardpdm_alertsAnomalies detected in the last 24 hours

Document Templates​

TemplatePurposeKey Components
Maintenance Work OrderWO summary and work instructionsEquipment info, work details, parts used, 3-level signature block
Equipment History CardEquipment lifecycle historyEquipment master data, maintenance history, failure history, lifecycle events
Failure Analysis ReportRoot cause analysis reportRCA, FMEA analysis results, recurrence prevention measures, 3-level signature block
Equipment Inspection ChecklistPM checklistInspection items, acceptance criteria, inspection results, remarks

Cross-Solution Integration​

Integration TargetIntegration DetailsReference Field
MROMaintenance materials SSOT (replaces eam_spare_parts)pm_parts_used.item_id > mro_item_master
ERPProduction order referenceeam_work_orders.production_order_id
MESLOT traceability referencefailure_records.lot_id
FEMSTriggers equipment inspection on energy anomalyeam_work_orders.trigger_source
MRO Dependency

The EAM solution is declared with requiredSolutions: ['mro']. The MRO solution's mro_item_master serves as the SSOT (Single Source of Truth) for maintenance materials, while EAM's eam_spare_parts table is retained for compatibility when MRO is not deployed.

EAM Overall Relationship Diagram​